Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 20s
Wired panic through :go stmt (v0 sync surfaces back to spawner — matches real Go's "crash whole program" end-effect) and through go-eval-for (was swallowing panic at the loop boundary). 8 tests added: goroutine-panic-surfaces, goroutine-recover-via- spawner-defer, multi-defer-LIFO-with-recover, defer-fires-on-panic- path, panic(nil), panic-in-loop, defer-still-runs-in-panicking-fn, args-eager-on-panic-path. 20 Phase-6 tests total; +20 acceptance bar cleared (eval/ 80 → 100). Shape: 4 control-flow sites now repeat the same sentinel dispatch arm (return-value, break, continue, eval-error, go-panic). The scheduler kit should bake in a single propagates? helper rather than have each guest evaluator list every sentinel inline — diary documents the cross-cutting abstraction. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
46 KiB
46 KiB