Files
rose-ash/lib/go/scoreboard.md
giles 1d3021d206
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 24s
go: after(d) timer stub + 13 pattern tests → runtime 40/40, Phase 5 closed [shapes-scheduler]
Acceptance bar hit (40 runtime, 497 total). Tests: timer ready,
select-with-timeout, fan-in (3 producers), worker queue, pipeline,
fan-out-then-fan-in, select source-order, fallback case, default,
producer-consumer, two-stage pipeline, channel-counter, after+default,
tick-collector.

Shape chiselled: timer collapses "after duration" into
"channel ready immediately" — select needs only ready? from each
case. Real time is when the flip happens, not what the protocol is.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 22:24:13 +00:00

324 B

Go-on-SX Scoreboard

Total: 497 / 497 tests passing

Suite Pass Total
lex 129 129
parse 176 176
types 72 72
eval 80 80
runtime 40 40
stdlib 0 0
e2e 0 0

Generated by lib/go/conformance.sh.