plans: log blocker — sx-tree MCP disconnected at start of Phase 10
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 45s

This commit is contained in:
2026-05-08 07:46:59 +00:00
parent fa43aa6711
commit 58c6ec27f3

View File

@@ -346,6 +346,10 @@ _Newest first._
## Blockers
- 2026-05-08: **sx-tree MCP server disconnected at start of Phase 10.**
Path-based sx-tree tools error with `Type_error("Expected string, got null")`
and the server then dropped entirely (45 tools unavailable). Loop paused
at Phase 10 step 1 (`⍸ where`); resume once `/mcp` reconnects sx-tree.
- 2026-05-07: **sx-tree MCP server disconnected mid-Phase-9.** `lib/apl/**.sx`
edits require `sx-tree` per CLAUDE.md — Edit/Read on `.sx` is hook-blocked.
Loop paused at Phase 9 step 2 (inline assignment); resume once MCP restored.