Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 22s
(timeout budget node) bounds a node deterministically: nodes opt in via (tick), budget ticks are allowed, the next raises flow-timeout. No scheduler/clock in pure SX so the budget is a step count, not wall-clock. Budgets nest and are per-run. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>