Files
rose-ash/plans
giles 91ffba9975
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 31s
flow: Phase 1 declarative DAG — sequence/parallel/defflow combinators + 18 tests
Flow combinators as a Scheme prelude loaded onto scheme-standard-env; a flow is a
Scheme procedure input->output, run inside the interpreter (sets up Phase 3 call/cc
suspend). flow/start entry point, conformance runner, scoreboard.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-06 16:22:22 +00:00
..