Files
rose-ash/lib/artdag/scoreboard.md
giles 64ddd29176
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 1m4s
artdag: optimize composition pass (fuse + dce) + 4 tests
artdag/optimize entries outputs fusible? fuses the entry list then DCEs against
the output names — sinks survive fusion (never absorbed), so output-equivalent
with fewer nodes. optimize 22/22, total 132/132.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-07 12:25:41 +00:00

380 B

artdag Conformance Scoreboard

Generated by lib/artdag/conformance.sh

Suite Pass Fail Total
dag 20 0 20
analyze 16 0 16
plan 18 0 18
execute 15 0 15
optimize 22 0 22
fed 15 0 15
cost 13 0 13
serialize 13 0 13
Total 132 0 132