Files
rose-ash/plans
giles 5b38f4d499
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 21s
ocaml: phase 5.1 triangle.ml baseline (Pascal-shape min path sum, 2+3+5+1 = 11)
Bottom-up DP minimum-path through a triangle:

       2
      3 4
     6 5 7
    4 1 8 3

  let min_path_triangle rows =
    initialise dp from last row;
    for r = n - 2 downto 0 do
      for c = 0 to row_len - 1 do
        dp.(c) <- row.(c) + min(dp.(c), dp.(c+1))
      done
    done;
    dp.(0)

The optimal path 2 -> 3 -> 5 -> 1 sums to 11.

Tests downto loop, Array.of_list inside loop body, nested arr.(i)
reads + writes, and inline if-then-else for min.

74 baseline programs total.
2026-05-09 15:32:11 +00:00
..