Commit Graph

9 Commits

Author SHA1 Message Date
ffc3716b0e prolog: append.pl + append.sx classic, 6 tests (build/check/split/deduce)
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 03:58:12 +00:00
7fb4c52159 prolog: is/2 arithmetic with + - * / mod abs, 11 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 03:27:56 +00:00
072735a6de prolog: write/1 + nl/0 via output buffer, 7 tests; built-ins box done
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 02:56:31 +00:00
1846be0bd8 prolog: ->/2 if-then-else (in ; and standalone), 9 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 02:23:44 +00:00
3adad8e50e prolog: \=/2 + ;/2 + call/1 built-ins, 11 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:48:57 +00:00
f019d42727 prolog: cut !/0 with two-cut-box barrier scheme, 6 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:14:12 +00:00
738f44e47d prolog: DFS solver (CPS, trail-based) + true/fail/=/conj built-ins, 18 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:38:50 +00:00
1888c272f9 prolog: clause DB + loader (functor/arity → clauses), 14 tests green
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:59:46 +00:00
99753580b4 Recover agent-loop progress: lua/prolog/forth/erlang/haskell phases 1-2
Salvaged from worktree-agent-* branches killed during sx-tree MCP outage:
- lua: tokenizer + parser + phase-2 transpile (~157 tests)
- prolog: tokenizer + parser + unification (72 tests, plan update lost to WIP)
- forth: phase-1 reader/interpreter + phase-2 colon/VARIABLE (134 tests)
- erlang: tokenizer + parser (114 tests)
- haskell: tokenizer + parse tests (43 tests)

Cherry-picked file contents only, not branch history, to avoid pulling in
unrelated ocaml-vm merge commits that were in those branches' bases.
2026-04-24 16:03:00 +00:00