Commit Graph

4 Commits

Author SHA1 Message Date
f240c46fa8 plan: account for celery-sx as the distributed/durable runner adapter
celery-sx = one more runner on artdag/op-table-runner, not a Celery port: broker=persist KV,
workers=er-scheduler, result backend=content-addressed (dedup free), retries/replay=flow-on-
erlang, fan-out=artdag/schedule. ~few hundred lines of glue, zero packages, 'Celery the way it
should have been' on erlang-on-sx. DEMAND-DRIVEN (RX) — build when a DAG needs heavy compute /
long-running-retryable / cross-machine fan-out; the synchronous op-table runner covers P0.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-02 13:35:44 +00:00
c147020059 plan: elevate — business logic IS art-dag; substrates are adapters
Reframe after the user's insight, confirmed in code: artdag-on-sx already IS the substrate-
independent behavior engine — artdag/run injects the RUNNER (execution adapter: SX op-table /
Erlang / Celery), federation.sx injects the TRANSPORT (communication adapter: fed-sx / HTTP /
IPFS). Business logic = a content-addressed DAG; durability is a RUNNER capability (same DAG runs
eager or durable); deployment (subdomain service / peer / L1 worker) is placement. fed-sx+Erlang
is ONE adapter set, not the architecture. The type carries content-grammar + allowed-relations +
a behavior DAG. The prior fed-sx/Erlang framing is kept as one concrete first slice.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-02 13:31:10 +00:00
5b46a18c61 plan: review corrections to business-logic-fed-flows
Three framing fixes after review: (1) the event source is object-level state changes, NOT just
CID deltas — relations write edge:* rows so they don't shift the CID; content/status → Create/
Update, relations → Add/Remove (ActivityPub-faithful). (2) verbs are TRANSITIONS (on-publish =
draft→published, fire-once, not every delta of a published post). (3) the hybrid flow split is by
DURABILITY not complexity — the execute-fold is eager/synchronous (no wait); suspend/timer/human
flows are the Erlang escape hatch. Plus: effects-as-data need a DRIVER (host, for P0); P0.2 must
gate on the transition + run in the handler body (VmSuspended/er-scheduler risk); P0.3 gets an
acceptance criterion; P3 flags the fed-sx delivery M2 blocker + the deferred actor model.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-02 13:02:59 +00:00
3675d059b5 host P0.1: publish-activity contract for federated composition-flows
Business logic as federated composition-flows (plans/business-logic-fed-flows.md). P0.1: the
host describes a published post as a fed-sx activity — host/blog--publish-activity(slug) →
{:type "create" :actor "site" :id <CID> :object {:type "article" :slug :category}} — the
exact shape next/'s trigger machinery consumes (verified: next/tests/triggers_e2e.sh 10/10).
category (drives the flow branch: newsletter suspends / urgent fires / else skip) comes from
the "category" field-value, else the first tag, else "urgent". + host/blog--post-category.

Design decided: activity log = every CID delta (event source); triggers = declared subscriptions
(DefineTrigger); flows hybrid (SX composition for simple via the execute-fold, named Erlang flows
for complex); federated execution = Erlang (next/); the type carries content+relations+behavior.

blog 200/200 (+3: contract, category fallback, missing-post nil).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-02 12:55:08 +00:00