04a25d17d0
haskell: seq + deepseq via lazy-builtin flag (+9 tests, 368/368)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:28:19 +00:00
47f66ad1be
forth: pictured numeric output <#/#/#S/#>/HOLD/SIGN + U./U.R/.R (Hayes 448/638, 70%)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:23:04 +00:00
4e7d2183ad
smalltalk: tokenizer + 63 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:19:23 +00:00
6a00df2609
smalltalk: plan + briefing + sx-loops 8th slot
...
Showcase: blocks with non-local return on captured method-return
continuation. ANSI-ish Smalltalk-80 subset, SUnit + Pharo Kernel-Tests
slice, 7 phases. Worktree: /root/rose-ash-loops/smalltalk on
branch loops/smalltalk.
2026-04-25 00:05:31 +00:00
4e2e2c781c
HS-plan: cluster 31 runtime null-safety blocked (Bucket-D scope)
...
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
All 18 tests are SKIP (untranslated). Implementing the upstream
`error("HS")` helper requires coordinated work across the generator,
compiler (~17 emit paths), runtime (named-target helpers), and
function-call/possessive-base null guards. Doesn't fit a single
loop iteration — needs a dedicated design doc + worktree like the
Bucket E subsystems.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-25 00:01:24 +00:00
51ba2da119
erlang: echo.erl minimal server (+7 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:00:47 +00:00
1888c272f9
prolog: clause DB + loader (functor/arity → clauses), 14 tests green
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:59:46 +00:00
cc5315a5e6
haskell: lazy : + ranges + Prelude (repeat/iterate/fibs/take, +25 tests, 359/359)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:58:21 +00:00
c726a9e0fe
forth: double-cell ops D+/D-/DNEGATE/DABS/D=/D</D0=/D0</DMAX/DMIN (+18)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:52:43 +00:00
8a8d0e14bd
erlang: bank.erl account server (+8 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:28:24 +00:00
b6810e90ab
forth: mixed/double-cell math (S>D M* UM* UM/MOD FM/MOD SM/REM */ */MOD); Hayes 342→446 (69%)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:25:43 +00:00
0e53e88b02
haskell: thunks + force, app args become lazy (+6 tests, 333/333)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:22:21 +00:00
0962e4231c
erlang: ping_pong.erl (+4 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:56:28 +00:00
3ab01b271d
forth: Phase 5 memory + unsigned compare (Hayes 268→342, 53%)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:56:26 +00:00
fba92c2b69
haskell: strict evaluator + 38 eval tests, Phase 2 complete (329/329)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:49:12 +00:00
8e1466032a
forth: LSHIFT/RSHIFT + 32-bit arith truncation + early binding (Hayes 174→268)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:26:58 +00:00
2a3340f8e1
erlang: ring.erl + call/cc suspension rewrite (+4 ring tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:24:17 +00:00
1aa06237f1
haskell: value-level pattern matcher (+31 tests, 281/281)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:15:13 +00:00
e9c8f803b5
haskell: runtime constructor registry (+24 tests, 250/250)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:45:51 +00:00
97513e5b96
erlang: exit/1 + process termination (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:34:21 +00:00
ef81fffb6f
haskell: desugar guards/where/list-comp → core AST (+15 tests, 226/226)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:16:53 +00:00
387a6e7f5d
forth: SP@ / SP! (+4; Hayes 174/590)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:07:10 +00:00
e2e801e38a
erlang: receive...after Ms timeout clause (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:01:39 +00:00
cab7ca883f
haskell: operator sections + list comprehensions, Phase 1 parser complete (+22 tests, 211/211)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:47:51 +00:00
acf9c273a2
forth: BASE/DECIMAL/HEX/BIN/OCTAL (+9; Hayes 174/590)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:40:11 +00:00
d191f7cd9e
erlang: send + selective receive via shift/reset (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:27:59 +00:00
35ce18eb97
forth: CHAR/[CHAR]/KEY/ACCEPT (+7; Hayes 174/590)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:12:31 +00:00
bf0d72fd2f
haskell: module header + imports (+16 tests, 189/189)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:08:30 +00:00
266693a2f6
erlang: spawn/1 + self/0 + is_pid (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:50:09 +00:00
1c975f229d
forth: Phase 4 strings — S"/C"/."/TYPE/COUNT/CMOVE/FILL/BLANK (+16; Hayes 168/590)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:45:40 +00:00
defbe0a612
haskell: guards + where clauses (+11 tests, 173/173)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:37:52 +00:00
bc1a69925e
erlang: scheduler + process record foundation (+39 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:16:01 +00:00
0e509af0a2
forth: Hayes conformance runner + baseline scoreboard (165/590, 28%)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:13:45 +00:00
869b0b552d
haskell: top-level decls (fn-clause, type-sig, data, type, newtype, fixity) + type parser (+24 tests, 162/162)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:06:38 +00:00
1dc96c814e
erlang: core BIFs + funs, Phase 2 complete (+35 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:43:25 +00:00
58dbbc5d8b
haskell: full patterns — as/lazy/negative/infix + lambda & let pat LHS (+18 tests, 138/138)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:34:47 +00:00
a47b3e5420
forth: vendor Gerry Jackson's forth2012-test-suite (Hayes Core + Ext)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:25:39 +00:00
7f4fb9c3ed
erlang: guard BIFs + call dispatch (+20 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:08:48 +00:00
36234f0132
haskell: case/do + minimal patterns (+19 tests, 119/119)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:00:58 +00:00
e066e14267
forth: DO/LOOP/+LOOP/I/J/LEAVE + return stack words (+16)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:58:37 +00:00
4965be71ca
erlang: pattern matching + case (+21 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:36:44 +00:00
bb16477fd4
forth: BEGIN/UNTIL/WHILE/REPEAT/AGAIN (+9)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:33:25 +00:00
6ccef45ce4
haskell: expression parser + precedence climbing (+42 tests, 100/100)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:31:38 +00:00
c07ff90f6b
haskell: layout rule per §10.3 (+15 tests, 58/58)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:05:35 +00:00
b2939c1922
forth: IF/ELSE/THEN + PC-driven body runner (+18)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:03:41 +00:00
efbab24cb2
erlang: sequential eval (+54 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:03:00 +00:00
60b7f0d7bb
prolog: tick phase 1+2 boxes (parse 25/25, unify 47/47 green)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 16:58:30 +00:00
99753580b4
Recover agent-loop progress: lua/prolog/forth/erlang/haskell phases 1-2
...
Salvaged from worktree-agent-* branches killed during sx-tree MCP outage:
- lua: tokenizer + parser + phase-2 transpile (~157 tests)
- prolog: tokenizer + parser + unification (72 tests, plan update lost to WIP)
- forth: phase-1 reader/interpreter + phase-2 colon/VARIABLE (134 tests)
- erlang: tokenizer + parser (114 tests)
- haskell: tokenizer + parse tests (43 tests)
Cherry-picked file contents only, not branch history, to avoid pulling in
unrelated ocaml-vm merge commits that were in those branches' bases.
2026-04-24 16:03:00 +00:00
e274878052
HS-plan: log cluster 29 blocked
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:50:22 +00:00
a3d1c37c95
HS-plan: scoreboard — cluster 29 blocked, C=4 done + 1 blocked
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:47:25 +00:00