|
|
b073a82b33
|
erlang: Phase 10a — trace JIT/compiler architecture, scope into 10a.1-4, block on lib/compiler.sx
|
2026-05-15 09:03:50 +00:00 |
|
|
|
7996bcdacf
|
erlang: 10b BIF-complete (10/18); control opcodes correctly gated on 10a + log
|
2026-05-15 08:59:11 +00:00 |
|
|
|
5774065341
|
erlang: 10b progress — 8/18 handlers real (hot-BIFs done) + log
|
2026-05-15 08:51:37 +00:00 |
|
|
|
e6261c2519
|
erlang: mark 10b in-progress (vertical slice) + progress log
|
2026-05-15 08:44:29 +00:00 |
|
|
|
33725de03b
|
erlang: Phase 9g — ring bench on integrated binary (no regression); scope Phase 10
|
2026-05-15 08:36:05 +00:00 |
|
|
|
5fd358a7a7
|
erlang: Phase 9i — SX dispatcher consults extension-opcode-id (+6 vm tests, 715/715)
|
2026-05-15 08:30:52 +00:00 |
|
|
|
783e0cb5fe
|
erlang: tick 9h + progress log
|
2026-05-15 08:25:32 +00:00 |
|
|
|
12b56afcd3
|
erlang: Phase 9a integrated (cherry-pick + force-link); plan 9h/9i added
|
2026-05-15 08:11:55 +00:00 |
|
|
|
64b7263c5f
|
erlang: Phase 9g — log perf-bench blocker on 9a; conformance half clean at 709/709
|
2026-05-14 21:28:10 +00:00 |
|
|
|
e8a5c2e1ba
|
erlang: Phase 9f — hot-BIF opcode table (+18 vm tests)
|
2026-05-14 21:26:51 +00:00 |
|
|
|
3efd735283
|
erlang: Phase 9e — OP_SPAWN / OP_SEND + VM-process registry (+16 vm tests)
|
2026-05-14 21:20:37 +00:00 |
|
|
|
10623da0b0
|
erlang: Phase 9d — OP_RECEIVE_SCAN stub (+10 vm tests)
|
2026-05-14 21:13:40 +00:00 |
|
|
|
528b24a1cd
|
erlang: Phase 9c — OP_PERFORM / OP_HANDLE stubs (+9 vm tests)
|
2026-05-14 21:08:12 +00:00 |
|
|
|
25924d6212
|
erlang: Phase 9b — stub VM dispatcher + 3 pattern opcodes (+19 vm tests)
|
2026-05-14 20:52:26 +00:00 |
|
|
|
0abf05ed83
|
erlang: log Phase 9a (opcode-extension) as Blocker — out of scope
|
2026-05-14 20:46:38 +00:00 |
|
|
|
f6a6865635
|
erlang: sync fed-sx + opcode-ext plans; add Phase 9 (specialized opcodes)
|
2026-05-14 20:45:05 +00:00 |
|
|
|
6636f9c170
|
erlang: extract ffi test suite (637/637, ffi 14/14)
|
2026-05-14 20:21:51 +00:00 |
|
|
|
29fd70f17a
|
erlang: file:read_file/write_file/delete BIFs (+10 eval tests, 633/633)
|
2026-05-14 20:14:31 +00:00 |
|
|
|
3d092dd78e
|
erlang: er-to-sx / er-of-sx term marshalling (+23 runtime tests)
|
2026-05-14 20:07:35 +00:00 |
|
|
|
2ee5e45515
|
erlang: migrate BIFs onto registry, delete cond dispatchers (600/600)
|
2026-05-14 19:41:30 +00:00 |
|
|
|
498d2533d8
|
erlang: Phase 8 BIF registry foundation (+18 runtime tests, 600/600)
|
2026-05-14 19:34:30 +00:00 |
|
|
|
925bbd0d42
|
erlang: Phase 7 capstone — full hot-reload ladder green (+5 eval tests)
|
2026-05-14 19:29:15 +00:00 |
|
|
|
b5e93df82e
|
erlang: verify hot-reload call dispatch semantics (+6 eval tests)
|
2026-05-14 19:17:59 +00:00 |
|
|
|
582baf5bfd
|
erlang: code:which/is_loaded/all_loaded introspection (+10 eval tests)
|
2026-05-14 19:08:34 +00:00 |
|
|
|
cd45ebcc7a
|
erlang: code:purge/1 + code:soft_purge/1 (+10 eval tests)
|
2026-05-14 19:02:24 +00:00 |
|
|
|
89a6b30501
|
erlang: code:load_binary/3 hot-reload BIF (+8 eval tests)
|
2026-05-14 18:52:45 +00:00 |
|
|
|
0c389d4696
|
erlang: module-version slot (Phase 7 step 1, +13 runtime tests)
|
2026-05-14 17:35:02 +00:00 |
|
|
|
7602ec1a69
|
erlang: plan Phase 7 (hot code reload) + Phase 8 (FFI BIFs)
|
2026-05-14 16:19:34 +00:00 |
|
|
|
44dc32aa54
|
erlang: round-out BIFs (+40 tests), full plan ticked at 530/530
Test, Build, and Deploy / test-build-deploy (push) Failing after 10s
|
2026-04-25 08:06:17 +00:00 |
|
|
|
a8cfd84f18
|
erlang: ETS-lite (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 07:32:24 +00:00 |
|
|
|
ce8ff8b738
|
erlang: binary pattern matching <<...>> (+21 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 06:54:58 +00:00 |
|
|
|
193b0c04be
|
erlang: list comprehensions (+12 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 06:19:14 +00:00 |
|
|
|
8e809614ba
|
erlang: register/whereis, Phase 5 complete (+12 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 05:43:57 +00:00 |
|
|
|
47a59343a1
|
erlang: supervisor one-for-one (+7 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 05:09:41 +00:00 |
|
|
|
8717094e74
|
erlang: gen_server behaviour (+10 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 04:36:29 +00:00 |
|
|
|
424b5ca472
|
erlang: -module/M:F cross-module calls (+10 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 04:01:14 +00:00 |
|
|
|
882205aa70
|
erlang: try/catch/of/after, Phase 4 complete (+19 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 03:26:01 +00:00 |
|
|
|
1a5a2e8982
|
erlang: exit-signal propagation + trap_exit (+11 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 02:51:32 +00:00 |
|
|
|
c363856df6
|
erlang: link/unlink/monitor/demonitor + refs (+17 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 02:16:04 +00:00 |
|
|
|
aa7d691028
|
erlang: ring benchmark + results — Phase 3 closed
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 01:41:54 +00:00 |
|
|
|
089e2569d4
|
erlang: conformance.sh + scoreboard (358/358 across 9 suites)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 01:06:23 +00:00 |
|
|
|
1516e1f9cd
|
erlang: fib_server.erl, 5/5 classic programs (+8 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 00:33:18 +00:00 |
|
|
|
51ba2da119
|
erlang: echo.erl minimal server (+7 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-25 00:00:47 +00:00 |
|
|
|
8a8d0e14bd
|
erlang: bank.erl account server (+8 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 23:28:24 +00:00 |
|
|
|
0962e4231c
|
erlang: ping_pong.erl (+4 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 22:56:28 +00:00 |
|
|
|
2a3340f8e1
|
erlang: ring.erl + call/cc suspension rewrite (+4 ring tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 22:24:17 +00:00 |
|
|
|
97513e5b96
|
erlang: exit/1 + process termination (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 21:34:21 +00:00 |
|
|
|
e2e801e38a
|
erlang: receive...after Ms timeout clause (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 21:01:39 +00:00 |
|
|
|
d191f7cd9e
|
erlang: send + selective receive via shift/reset (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 20:27:59 +00:00 |
|
|
|
266693a2f6
|
erlang: spawn/1 + self/0 + is_pid (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
|
2026-04-24 19:50:09 +00:00 |
|