52523606a8
smalltalk: class table + bootstrap hierarchy + 54 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:34:59 +00:00
f019d42727
prolog: cut !/0 with two-cut-box barrier scheme, 6 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:14:12 +00:00
e71154f9c6
smalltalk: chunk-stream parser + pragmas + 21 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:11:44 +00:00
089e2569d4
erlang: conformance.sh + scoreboard (358/358 across 9 suites)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 01:06:23 +00:00
cd489b19be
haskell: do-notation desugar + stub IO monad (return/>>=/>>) (+14 tests, 382/382)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:59:42 +00:00
33ce994f23
smalltalk: expression parser + 47 parse tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:46:03 +00:00
738f44e47d
prolog: DFS solver (CPS, trail-based) + true/fail/=/conj built-ins, 18 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:38:50 +00:00
7735eb7512
HS-plan: cluster 32 MutationObserver blocked (env + scope)
...
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
loops/hs worktree ships without the sx-tree MCP binary built; even
after running `dune build bin/mcp_tree.exe` this iteration, tools
don't surface mid-session and the block-sx-edit hook prevents raw
`.sx` edits. The cluster scope itself spans parser/compiler/runtime
plus JS mock plus generator skip-list, so even with sx-tree loaded
it's a multi-commit job for a dedicated worktree.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-25 00:33:18 +00:00
1516e1f9cd
erlang: fib_server.erl, 5/5 classic programs (+8 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:33:18 +00:00
04a25d17d0
haskell: seq + deepseq via lazy-builtin flag (+9 tests, 368/368)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:28:19 +00:00
4e7d2183ad
smalltalk: tokenizer + 63 tests
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:19:23 +00:00
6a00df2609
smalltalk: plan + briefing + sx-loops 8th slot
...
Showcase: blocks with non-local return on captured method-return
continuation. ANSI-ish Smalltalk-80 subset, SUnit + Pharo Kernel-Tests
slice, 7 phases. Worktree: /root/rose-ash-loops/smalltalk on
branch loops/smalltalk.
2026-04-25 00:05:31 +00:00
4e2e2c781c
HS-plan: cluster 31 runtime null-safety blocked (Bucket-D scope)
...
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
All 18 tests are SKIP (untranslated). Implementing the upstream
`error("HS")` helper requires coordinated work across the generator,
compiler (~17 emit paths), runtime (named-target helpers), and
function-call/possessive-base null guards. Doesn't fit a single
loop iteration — needs a dedicated design doc + worktree like the
Bucket E subsystems.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-25 00:01:24 +00:00
51ba2da119
erlang: echo.erl minimal server (+7 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-25 00:00:47 +00:00
1888c272f9
prolog: clause DB + loader (functor/arity → clauses), 14 tests green
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:59:46 +00:00
cc5315a5e6
haskell: lazy : + ranges + Prelude (repeat/iterate/fibs/take, +25 tests, 359/359)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:58:21 +00:00
8a8d0e14bd
erlang: bank.erl account server (+8 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:28:24 +00:00
0e53e88b02
haskell: thunks + force, app args become lazy (+6 tests, 333/333)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 23:22:21 +00:00
0962e4231c
erlang: ping_pong.erl (+4 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:56:28 +00:00
fba92c2b69
haskell: strict evaluator + 38 eval tests, Phase 2 complete (329/329)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:49:12 +00:00
2a3340f8e1
erlang: ring.erl + call/cc suspension rewrite (+4 ring tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:24:17 +00:00
1aa06237f1
haskell: value-level pattern matcher (+31 tests, 281/281)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 22:15:13 +00:00
e9c8f803b5
haskell: runtime constructor registry (+24 tests, 250/250)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:45:51 +00:00
97513e5b96
erlang: exit/1 + process termination (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:34:21 +00:00
ef81fffb6f
haskell: desugar guards/where/list-comp → core AST (+15 tests, 226/226)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:16:53 +00:00
e2e801e38a
erlang: receive...after Ms timeout clause (+9 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 21:01:39 +00:00
cab7ca883f
haskell: operator sections + list comprehensions, Phase 1 parser complete (+22 tests, 211/211)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:47:51 +00:00
d191f7cd9e
erlang: send + selective receive via shift/reset (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:27:59 +00:00
bf0d72fd2f
haskell: module header + imports (+16 tests, 189/189)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 20:08:30 +00:00
266693a2f6
erlang: spawn/1 + self/0 + is_pid (+13 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:50:09 +00:00
defbe0a612
haskell: guards + where clauses (+11 tests, 173/173)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:37:52 +00:00
bc1a69925e
erlang: scheduler + process record foundation (+39 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:16:01 +00:00
869b0b552d
haskell: top-level decls (fn-clause, type-sig, data, type, newtype, fixity) + type parser (+24 tests, 162/162)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 19:06:38 +00:00
1dc96c814e
erlang: core BIFs + funs, Phase 2 complete (+35 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:43:25 +00:00
58dbbc5d8b
haskell: full patterns — as/lazy/negative/infix + lambda & let pat LHS (+18 tests, 138/138)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:34:47 +00:00
7f4fb9c3ed
erlang: guard BIFs + call dispatch (+20 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:08:48 +00:00
36234f0132
haskell: case/do + minimal patterns (+19 tests, 119/119)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 18:00:58 +00:00
4965be71ca
erlang: pattern matching + case (+21 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:36:44 +00:00
6ccef45ce4
haskell: expression parser + precedence climbing (+42 tests, 100/100)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:31:38 +00:00
c07ff90f6b
haskell: layout rule per §10.3 (+15 tests, 58/58)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:05:35 +00:00
efbab24cb2
erlang: sequential eval (+54 tests)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 17:03:00 +00:00
60b7f0d7bb
prolog: tick phase 1+2 boxes (parse 25/25, unify 47/47 green)
Test, Build, and Deploy / test-build-deploy (push) Has been cancelled
2026-04-24 16:58:30 +00:00
99753580b4
Recover agent-loop progress: lua/prolog/forth/erlang/haskell phases 1-2
...
Salvaged from worktree-agent-* branches killed during sx-tree MCP outage:
- lua: tokenizer + parser + phase-2 transpile (~157 tests)
- prolog: tokenizer + parser + unification (72 tests, plan update lost to WIP)
- forth: phase-1 reader/interpreter + phase-2 colon/VARIABLE (134 tests)
- erlang: tokenizer + parser (114 tests)
- haskell: tokenizer + parse tests (43 tests)
Cherry-picked file contents only, not branch history, to avoid pulling in
unrelated ocaml-vm merge commits that were in those branches' bases.
2026-04-24 16:03:00 +00:00
e274878052
HS-plan: log cluster 29 blocked
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:50:22 +00:00
a3d1c37c95
HS-plan: scoreboard — cluster 29 blocked, C=4 done + 1 blocked
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:47:25 +00:00
2b486976a6
HS-plan: mark cluster 29 blocked
...
sx-tree MCP file ops broken this session (Yojson Type_error "Expected
string, got null" on every file-based call — sx_read_subtree,
sx_find_all, sx_replace_by_pattern, sx_summarise, sx_pretty_print, even
sx_load_check on existing files works but summarise fails). Can't edit
integration.sx to add before:init/after:init dispatch. Additionally 4
of the 6 tests fundamentally require stricter parser error-rejection
(add - to currently parses to (set! nil ...); on click blargh end
accepts blargh as symbol expression) — out of single-cluster budget.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:46:55 +00:00
6e92a5ad66
HS-plan: claim cluster 29 hyperscript:before:init events
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:31:52 +00:00
2cd8e57694
HS-plan: log cluster 19 (pick regex + indices) done +13
...
Cluster 19 was implemented in 4be90bf2 but the plan/scoreboard rows
still marked it pending. Sync the plan state: mark done, add log entry,
bump merged total 1264 → 1277.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:31:11 +00:00
0f67021aa3
plans: briefings + roadmaps for lua, prolog, forth, erlang, haskell
...
Five new guest-language plans mirroring the js-on-sx / hs-loop pattern, each
with a phased roadmap (Progress log + Blockers), a self-contained agent
briefing for respawning a long-lived loop, and a shared restore-all.sh that
snapshots state across all seven language loops.
Briefings bake in the lessons from today's stall debugging: never call
sx_build (600s watchdog), only touch lib/<lang>/** + own plan file, commit
every feature, update Progress log on each commit, route shared-file
issues to Blockers rather than fixing them.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-04-24 15:16:45 +00:00
d865c4d58d
HS: plan/scoreboard — fill in SHA 6c1da921 for cluster 28
2026-04-24 14:08:29 +00:00