afe69cbdc6
|
artdag: cost-based scheduling — critical path + makespan + speedup + 13 tests
Test, Build, and Deploy / test-build-deploy (push) Failing after 56s
cost.sx: injected cost-fn keeps media costs opaque. critical-path = longest
weighted path (= unlimited-worker makespan); makespan sums each batch's slowest
node (full plan == critical path, serial == total-work); speedup = work/makespan.
cost 13/13, total 115/115.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
|