flow: end-to-end integration suite + 10 tests (Phase 7)
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 54s
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 54s
Realistic flows composing every phase: an order pipeline (validate via attempt -> payment suspend -> branch -> ledger federation via remote-node) and an onboarding flow, each run through the full lifecycle including a simulated crash (export/wipe/ import) and a peer handoff mid-flow, with flow/pending|status|result introspection. 142/142 across 9 suites. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -16,7 +16,7 @@ federation extension via fed-sx for remote-node execution.
|
||||
|
||||
## Status (rolling)
|
||||
|
||||
`bash lib/flow/conformance.sh` → **132/132** (Phases 1-6 complete)
|
||||
`bash lib/flow/conformance.sh` → **142/142** (Phases 1-7 complete)
|
||||
|
||||
## Ground rules
|
||||
|
||||
@@ -159,6 +159,16 @@ Make the `(fail reason)` value channel compose into real validation/ETL pipeline
|
||||
- [x] `lib/flow/tests/railway.sx` — 10 cases: fail short-circuiting, no-run-after-
|
||||
failure, recover rejoin, validation pipeline reporting the failing stage
|
||||
|
||||
## Phase 7 — End-to-end integration
|
||||
|
||||
Prove the phases compose: realistic flows exercising attempt + suspend + branch +
|
||||
remote-node + crash-recovery + handoff + introspection together.
|
||||
|
||||
- [x] `lib/flow/tests/integration.sx` — 10 cases: an order-processing flow (validate
|
||||
→ payment suspend → branch → ledger federation) and an onboarding flow, run through
|
||||
the full lifecycle including a simulated crash and a peer handoff mid-flow, plus
|
||||
introspection (`flow/pending`/`status`/`result`) during the flow's life
|
||||
|
||||