artdag: Phase 5 optimization — DCE + CSE + adjacent-op fusion + 18 tests
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 57s
Some checks failed
Test, Build, and Deploy / test-build-deploy (push) Failing after 57s
optimize.sx adds three result-preserving passes: dce (keep outputs + ancestors, preserve ids), cse (==build; structural sharing is free from content addressing), and fuse (collapse 1-to-1 fusible unary chains into an artdag/pipeline node fed by the chain head's input; leaves/fan-out/non-fusible ops never fuse). fusing-runner replays pipeline stages, output-equivalent to the unfused dag. optimize 18/18, total 87/87. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -8,4 +8,5 @@ _Generated by `lib/artdag/conformance.sh`_
|
||||
| analyze | 16 | 0 | 16 |
|
||||
| plan | 18 | 0 | 18 |
|
||||
| execute | 15 | 0 | 15 |
|
||||
| **Total** | **69** | **0** | **69** |
|
||||
| optimize | 18 | 0 | 18 |
|
||||
| **Total** | **87** | **0** | **87** |
|
||||
|
||||
Reference in New Issue
Block a user